The New Faro Open

The distinct, deep-V-shaped hull that brought us broad acclaim to our Faro5, but specifically designed for up to 7 passengers and their gear. 

Performance

Electric Engine + Batteries

Cruising Speed
Range @ Cruising Speed
Top Speed
15.0 Kw
2 LiFe Batteries
8 knots
8 hours
12 knots

11.0 Kw

2 LiFe Batteries

6 knots

or 4 knots*

10 hours

to 16 hours*

10 knots

or 8 knots*

6.0 Kw
2 Lithium Battery
4 knots
10 hours
8 hours

Performance

Electric Engine + Batteries

15.0 Kw
2 LiFe Batteries
Cruising Speed
8 knots
Range @ Cruising Speed
8 hours
Top Speed
12 knots

11.0 Kw

2 LiFe Batteries

Cruising Speed

6 knots

or 4 knots*

Range @ Cruising Speed

10 hours

to 16 hours*

Top Speed

10 knots

or 8 knots*

6.0 Kw
2 Lithium Battery
Cruising Speed
4 knots
Range @ Cruising Speed
10 hours
Top Speed
8 knots

*when limited to 6,0 kW

Technical Specifications

Lenght

5m

Beam
2m
Electric Motor

From 6.0 to 15.0 kw

Batteries

LiFe / Lithium

Pax

7

Draft
0,3m

Through the European Economic Area (EEA) Agreement, Iceland, Liechtenstein, and Norway are partners, in the internal market, of the Member States of the European Union. As a way of promoting a continuous and balanced strengthening of the economic and trade relations, the parties of the European Economic Area Agreement have established a Multiannual Financial Mechanism, known as the EEA Grants. The EEA Grants aim to reduce the economic and social disparities in the European Economic Area and strengthen the bilateral relations between beneficiary and donor countries. For the period 2014-2021, a total contribution of 2.8 thousand million euros has been agreed to 15 beneficiary countries. Portugal will benefit from an amount of 102.7 million euros. Know more at www.eeagrants.gov.pt